2019 Dixin Automatic High Speed Double Shear Light Keel Steel Roof Tile Roll Former Making Machine

2019 CZPT automated high pace double shear light keel metal roof tile roll former producing machine

Solution description

CZPT parameters:

(one) Processing content: aluzinc/galvanized metal/coloured steel coil

(2) Content thickness: .3-.8mm

(3) Primary motor power: 4 kw

(four) Pump energy: 4kw

(five) Shaft diameter: 70mm and sound forming shaft

(six) Forming actions: 15 steps.

(seven) Roller material: forty five# solid metal, with tough chrome plating

(eight) Main body: 350H steel

(nine) Medium plate thickness: 16mm

(10) Manage systerm: PLC pc management with inverter

(eleven) Electrical power supply: 380V, three Phase, 60Hz or as your prerequisite

(12) 0veral sized:about 5800mm*1200mm*1300mm

Business Introduction :

 Our enterprise, HangCZPT CZPT Roll Forming Device Co., Ltd, as the specialist and foremost manufacturer, can manufacture, design and style, installation and debug different roll forming devices and steel processing sheet equipments, which produce metal roof wall panel, glazed roof tile, CZ steel  purlin, ground decking, roof ridge cap, sandwich panel, roof truss, shutter panel, shutter slat, doorway body, guardrail, and steel sheet uncoiler, bending, slitting, reducing, flattening, punching, crimping.

Backed by affordable layout, precision machining and picked materials, equally our normal and CZPT machines are characterised by extended lifestyle span, specific forming and easy procedure. With our customers’ have confidence in, our devices have been despatched to The us, Australia, Russia, India, Sri Lanka, Nigeria, Pakistan, Uzbekistan, Mozambique, Angola, Turkey, Brazil, and so forth.

Warmly welcome to China to go to our manufacturing unit and pick the equipment you want. Our deal with, Fuzhuang CZPT CZPT Zone, HangCZPT CZPT, ZheJiang Province, China

 

1) Payment: 30% T/T pay as you go, and spend the harmony ahead of delivery.

two) Shipping and delivery time: 30 doing work times.

3) Promise period: twelve months limited guarantee starting up from day of delivery. Shipping and delivery cost for elements to be changed throughout warranty time period have to be borne by the customer.

four) CZPT areas: bearings, buttons, chains, magnetic valve, protecting tube and so forth.

five) Installation and instruction:

a.If customers check out our manufacturing facility and check out the device, we will teach you how   to   put in and   use   the equipment, and also prepare your staff/technician encounter to encounter.

b.Without having visiting, we will deliver you person manual and CD to train you to put in and function.

c. Cost OF Installation:

The customer should spend the set up expenses (USD eighty 1 gentleman a single working day). To the seller’s appointed account by T/T prior to the seller’s experts go to the buyer’s factory. The buyer pays the seller’s professionals vacation value outside China, like spherical air tickets price, lodging and meals, supply transportation from residing hotel to the operate area, needed conversation, and insurance coverage, and so forth.

one. Are you the trade business or factory?

We are skilled producer for generating cold metal roll forming equipment.

two. How to check out your factory?

We can choose up you at the ZheJiang CZPT Airport or HangCZPT West Railway Station

to our manufacturing facility.

3. Do you supply CZPT devices?

Sure, we can style and make the devices as for each your requests. We are the specialist

designer and maker for cold metal roll forming devices.

4. Does a single equipment can only produce a single size?

Not specifically, it is dependent on the machine.

5. Is there quality manage when production the machines?

Indeed, we have dependable teams who will be in charge of the high quality control from laying off the raw substance, processing the machine frame, rollers, shafts and the other areas, making warmth therapy the rollers and shafts, installing, changing, screening and packaging, etc.

6. Why your price is greater than other people?

Because we insist on that each and every firm have to attach importance to the high quality at initial

area, we have to affirm to do well each and every phase of processing the equipment, to get much better top quality for the machines, and offer good services for our consumers.

7. What can you do if the machine broken?

The guarantee period of our machines is one yr. 

If there are any problem with any parts within promise time, we will courier the new ones for replacing inside of a single week. If following the warranty period, we can resolve the difficulties by negotiation each other as for each the real circumstance of devices. In any case we can assure to offer our technologies supports for the entire daily life of our devices.

8. Do you have soon after technologies support?

Sure, we are glad to give suggestions and also have experienced experts CZPT to services

equipment oversea if you required.

nine. Do you have oversea engineers?

Yes, we can source not only good skilled specialists to oversea, and also supply

technology training.

10. Can you response for the transportation of machines?

Sure, please check out us your location port or handle, we have good providers of

cooperated delivery line with us.

2019 Dixin Automatic High Speed Double Shear Light Keel Steel Roof Tile Roll Former Making Machine