Product | JAGUAR F8 | |
Heating System | one.Heating zones | Up 8 zones / bottom 8 zones |
two.Cooling zones | Up2/base two | |
3.Heating size | 3100mm | |
four.Heating method | complete scorching air cycle | |
5.Cooling Manner | Supporter wind cooling | |
Transporting Technique |
1.Mesh belt | 450mm |
2.max PCB Width | 400mm | |
3.Transmission Direction | L-R(R-L)optional | |
four.Transmission Web Peak | 900±20mm | |
5.Transmission kind | Chain rail & mesh belt | |
6.Transmission pace | -2000mm/min | |
Method Control | one.Electricity Offer | 5line 3phase 380V fifty/60Hz |
2.Established-up energy | 38kw | |
3.Regular power | 10kw | |
4.Heat-up time | approx 20min | |
five.Temperature range | Area temperature ~350°C | |
Temperature manage technique |
PID +SSR Push | |
seven.Temperature accuracy | ±1°C | |
eight. PCB temp. deviation | ±2°C | |
nine.Abnormity warning | Temperature abnormity warning | |
10.Entire System manage | Laptop+PLC | |
Proportions | L5000*W1320*H1450mm | |
Bodyweight | about 1600kg |
Product Attributes:
1. The manufacturer pc + Siemens PLC smart manage program, substantial precision temperature manage is ± 1-2 ºC (if the computer crash accident, and can realize off-line function, do not influence generation) and to ensure that the control technique is secure and dependable
2. Windows running interface, strong, easy procedure,
three. On the cylinder body open up computerized lifting equipment, make certain risk-free and dependable
4. Outfitted with mesh belt tensioning system, transportation easily and no shaking, deformation, guarantee sleek PCB transport Synchronous manual transmission system (and computerized SMT machine on the web relationship), guarantee that manual adjustable broad precision and large support life
5. Computerized management lubrication system, via the established arrive on time and fuel demand, automated lubrication transmission chain
6. All heating zone all by personal computer PID handle (higher temperature zone and reduce temperature zone implementation unbiased temperature management, can divide temperature spot by itself. Can open division heating, in purchase to decrease commencing power)
seven. Net/chain transmission by personal computer to have out the whole shut loop management, can satisfy various sorts of PCB generation at the identical time
8. With fault sound and mild alarm purpose
9. With leakage protector, make certain that the functioning personnel and management technique protection ten.The developed-in UPS and computerized delay shutdown program to ensure the PCB and return welder in electrical power or overheat not broken
11. The German ERSA entire world major microcirculation heating method, and the upper and lower impartial air microcirculation program, temperature uniformity and thermal payment substantial performance, large productive supercharged accelerated air duct, drastically boost the circulating sizzling air flow, temperature quickly (about 20 minutes), thermal compensation for high efficiency, substantial temperature welding and curing
12. The higher and decrease each temperature zone with independent temperature inductive sensor, actual-time monitoring and compensation each and every temperature zone temperature balance
13. Have password administration of the functioning technique, to avert the irrelevant personnel modifications to the approach parameters, procedure data management traceability method parameters change procedure, improve the management hassle-free. For storing person existing temperature speed environment and Configurations of the temperature curve, and can be employed for all data and curve printing
14. Built-in management window, the pc change, take a look at curve, print curve and information transmission are very easily operation, humanized design. Equipped with three-channel temperature curve on the web testing system, may possibly at any time to verify welding objects by the genuine temperature curve (CZPT the other match temperature curve tester)
15. From worldwide technology swift cooling system, use a magnifying glass type efficient quick cooling, cooling speed can reach three.five ~ 6 ºC / SEC, management is really practical The outer forced cooling unit, make certain that spot crystal influence (Selection chosen items, the regular configuration for pressured natural air cooling).
Speak to information:
Summer
Product sales Manager
Mob : 86~13 0571 88828 13858117778815447576
Tel:-755-23316315 Fax:-755-29497125
CZPT CZPT Products Co.,Ltd.
Insert:Constructing A07,Xihu (West Lake) Dis. CZPT Zone,Hongtian Highway, Xinqiao Avenue,Shajing,Baoan,HangCZPT,China
World wide web: www.CZPT-ele.internet